Utilities shall be provided within each subdivision in the following manner:
(a) Unless otherwise determined by the governing agency, overhead utility lines, where permitted, shall be located at the rear of all lots. The utility easement width shall be not less than twenty (20) feet. Utility poles shall be installed a minimum of two (2) feet from the center of the easement and at least two (2) feet from any side lot line or corner pin.
(b) Whenever a sanitary sewer line, storm sewer line, electric, gas, telephone line, and/or cablevision are each placed underground in the same utility easement, the following provisions shall be applicable:
(1) The total easement width shall be not less then twenty (20) feet; and,
(2) The sanitary or storm sewer lines shall be installed within seven (7) feet of one side of the easement and no other utility will be placed within five (5) feet of the sewer.
(Ord. 2002-25. Passed 4-8-03.)