1113.02 CONSTRUCTION PROCEDURE AND MATERIAL.
   The subdivider shall design and construct improvements not less than the standards outlined in these regulations. The work shall be done under appropriate engineering supervision and inspection and shall be completed within the time fixed or agreed upon by the City Engineer. The minimum requirements for materials shall be in accordance with the standard of the current volume of “Construction and Material Specifications” of the State of Ohio Department of Transportation.
(Ord. 2002-25. Passed 4-8-03.)