Upon approval or conditional approval of the floodplain permit application, the Floodplain Administrator shall provide the applicant with a floodplain permit with applicable specific requirements and conditions including, but not limited to, the following:
(A) The floodplain permit will become valid when all other necessary permits required by federal or state law are in place (44 C.F.R. § 60.3(a)(2));
(B) Completion of the development pursuant to the floodplain permit shall be completed within one year from the date of floodplain permit issuance or a time limit commensurate with the project construction time line for completion of the project or development:
(1) The applicant may request an extension for up to an additional year; and
(2) The request must be made at least 30 days prior to the permitted completion deadline.
(C) The applicant shall notify subsequent property owners and their agents and potential buyers of the floodplain development permit issued on the property and that such property is located within a regulated flood hazard area, and shall record the notice with the Floodplain Administrator (ARM § 36.15.204(2)(g));
(D) The applicant shall maintain the artificial obstruction or use to comply with the conditions and specifications of the permit;
(E) The applicant shall allow the Floodplain Administrator to perform on-site inspections at select intervals during construction or completion;
(F) The applicant shall provide periodic engineering oversight and/or interim reports during the construction period to be submitted to the Floodplain Administrator to confirm constructed elevations and other project elements;
(G) The applicant shall submit a compliance report, including certifications where required and applicable, including flood proofing, elevation, surface drainage, proper enclosure openings and materials to the Floodplain Administrator within 30 days of completion or other time as specified;
(H) The applicant shall submit an annual performance and maintenance report on bank stabilization or other projects utilizing maturing vegetative components to the Floodplain Administrator for a period of five years or a time specified in the permit; or
(I) The applicant shall submit evidence of a submittal of a FEMA letter of map revision (LOMR) to FEMA and applicable fees within six months of project completion and proceed with due diligence for acceptance of the document and necessary supporting materials by FEMA (44 C.F.R. § 65.3).
(Prior Code, § 11.06.080.050) (Ord. 6, passed 3-16-1981; Ord. 2021-15, passed 12-20-2021)