§ 11.05.070.010 CONTRACTOR QUALITY CONTROL AND OWNER QUALITY ASSURANCE.
   The minimum quality control testing to be performed by the contractor is identified below.
Test Specification/Material
Test Method
Minimum Required Frequency
Test Specification/Material
Test Method
Minimum Required Frequency
   Asphalt Concrete Pavement
Asphalt concrete pavement (base course and surface course)
Asphalt oil content
1 test/first day or 1/1000 TN
Gradation
1 test/first day or 1/1000 TN
Marshal test
1 test/day or 1/1500 TN
Mix design
1 submittal
Rice specific gravity (MPWSS 02510)
1 test/day or 1/1500 TN
Compaction of asphalt concrete pavement
In-place density/thickness (MPWSS 02510)
1 core/day or 1core/500 TN
   Earthworks
Compaction of crushed base course for roadways
In-place density (MPWSS 02235/1.3) 95% minimum
1 test/lift/4,00 square feet
Compaction of crushed base course under curbs, gutters and sidewalks
In-place density (MPWSS 02235/1.3) 95% minimum
1 test/lift/200 LF (C & G) or
1 test/lift/1,000 square feet (flatwork)
Compaction of subbase course for roadways
In-place density (MPWSS 02234/1.3) 95% minimum
1 test/lift/4,000 square feet
Compaction of subgrade and embarkment for roadways
In-place density (MPWSS 02230/1.3) 95% minimum
1 test/lift/4,000 square feet
Compaction of subgrade under curbs, gutters and sidewalks
In-place density (MPWSS 02230/1.3) 95% minimum
1 test/lift/200 LF (C & G) or 1 test/lift/1,000 square feet (flatwork)
Crushed base course
Gradation - moisture density - fractured faces (crushed) - LA abrasion, LL, PL and PI (MPWSS 02235)
1 submittal
Pipe bedding
Type I bedding gradation and plasticity index/type II bedding gradation (MPWSS 02221)
1 submittal
Subbase course
Gradation - moisture density - fractured faces (crushed) - LA abrasion, LL, PL and PI (MPWSS 02234)
1 sbmittal
Subgrade and embankment
Moisture-density (MPWSS 02230)
1 submittal per soil type encountered/1 submittal per borrow source
Trench backfill
Moisture-density (MPWSS 02221)
1 sub/soil type encountered
1 submittal/borrow source
Trench compaction
In-place density (MPWSS 02221/1.4) 97% minimum
1 test/lift/200 LF
Trench compaction (laterals outside the road template, structures, valves, hydrants and manholes)
In-place density (MPWSS 02221/1.4) 97% minimum
1 test/for each 2 feet of vertical depth/2 feet from edge of structure, valve, hydrant or manhole
   Portland Cement Concrete
Portland cement concrete
Mix design
1 submittal
Portland cement concrete flatwork and curb and gutter
Air, slump, and 7-day and 28-day compression strength (MPWSS 025152)
Every 50 CY
Portland cement concrete pavement
Air, slump, and 7-day and 28-day compression strength (MPWSS 025152)
Every 100 CY
 
(Prior Code, § 11.05.070.010) (Ord. 2019-9, passed 9-3-2019; Ord. 2021-15, passed 12-20-2021)