§ 4.20.040 FEE PAID BEFORE WATER IS TURNED ON.
   The water system development fee shall be paid before obtaining a building permit or must be paid before the water to the building is turned on.
(Prior Code, § 4.20.040) (Ord. 94, passed 4-2-2001)