(A) A complete final grading plan of the portion of the subdivision to be recorded;
(B) Profiles drawn to scale showing ground and grade elevations of all streets, highways, walkways, alleys, sanitary and storm sewers, and drainage ways;
(C) Detailed plans and specifications for street grading and construction of pavement section, curbs, gutters and sidewalks where required;
(D) Detailed plans and specifications for drainage structures and flood-control provisions;
(E) Detailed plans and specifications for sewer lines and water lines; and
(F) Detailed plans and specifications for power systems, including location and easements to be used.
(Prior Code, § 154.50) (Ord. 1978-6, passed 4-4-1978)