(A) Each subdivision shall be required to install a minimum number of connector roads to the city's main arterial road system to provide ingress/egress from the subdivision based on the following range of lots included within a primary plat:
(1) One to 49 lots: one ingress/egress road;
(2) 50 - 99 lots: two ingress/egress roads;
(3) 100 - 149 lots: three ingress/egress roads; and
(4) 150 and up lots: four ingress/egress roads.
(B) The number of ingress/egress roads required shall be based on the total number of lots in a subdivision, whether developed in a single phase or in multiple phases.
(Ord. 2023-5, passed 4-4-2023)