§ 52.407 CALCULATIONS AND DESIGN STANDARDS AND SPECIFICATIONS.
   (A)   Calculation of land disturbance should follow the guidelines discussed in § 52.307.
   (B)   The calculation methods as well as the type, sizing, and placement of all storm water quality management measures, or BMPs shall meet the design criteria, standards, and specifications outlined in the City of Decatur Storm Water Technical Standards Manual. The methods and procedures included in the referenced standards is in keeping with the above stated policy and meet or exceed the requirements of IDEM's MS4 GP.
(Ord. 2023-11, passed 8-1-2023)