13.12.190: WATER LINE CONNECTION; CITY LIABILITY FOR COSTS WITHIN SEVENTY FIVE FEET:
The City will pay for the cost of material and labor incurred in placing the water line from the main line to the property line of new hookups, or seventy five feet (75'), whichever is less. In the event the distance between the main line and the property line exceeds seventy five feet (75'), then the property owner shall be responsible for all costs of material and labor incurred in placing the water line beyond the said seventy five feet (75'). (Ord. 358, 2011)