ATTACHMENT B: ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION.
   Item 1.   Grading
   Item 2.   Preparation of existing granular base courses for surfacing
   Item 3.   Asphalt pavement
   Item 4.   Design of asphalt pavement structure
   Item 5.   Lowering water services
   Item 6.   Moving water boxes and water meters
   Item 7.   Adjusting manhole tops
   Item 8.   Street and traffic signs
   Table 4.   Conversion factors applicable to bases
   Table 5.   Composition limits for asphalt mixtures
   Table 6.   Thickness requirements of surface and base courses for asphalt paved streets and driveways
   Figure 4.   Determination of pavement thickness
   The work covered by this item of the specifications consists of furnishing all labor, equipment, and materials and in performing all operations in connection with the construction of asphalt concrete pavement for streets and alleys in accordance with this item of the specifications and the applicable drawings.