ITEM 13.0 STRUCTURES ENCOUNTERED IN THE PAVED AREA.
   13.1   MANHOLES AND CATCH BASINS: All manholes and catch basins encountered in the areas to be paved shall be raised or lowered to the surface of the new pavement. All catch basins shall be separated from the pavement and curb by boxing out around basin. Expansion joint material shall extend completely through curb and slab. Manhole castings within the pavement limits shall be boxed in like manner.
   When a joint falls within five feet of or contacts basins, manholes, or other structures one or more panels either side of opening shall be shortened to permit joint to fall on round structures and at or between corners of rectangular structures as shown in Figure 2, of Attachment A of these regulations.
   13.2   WATER SERVICES: When directed by the Planning Commission, or its duly authorized representative, water services encroaching on construction shall be lowered to conform to requirements of the new cross section and other construction details.
   Any work involving the cutting of water pipe in connection with this item or with other items in the contract shall be subject to inspection and approved by a representative of the Campbell County Water District Number One.
   13.3   MOVING WATER BOXES AND WATER METERS: When directed by the Planning Commission, or its duly authorized representative, water stop boxes or water meters encountered shall be relocated and subject to the approval of the representative of the Campbell County Water District Number One.
(Ord. 1971-2, passed 4-6-71)