SECTION 7.15 CONSTRUCTION RESPONSIBILITIES.
   The subdivider and/or contractor shall have available on the project, at all times, two copies of all required plans and specifications. He shall cooperate with the inspector and with other contractors in every way possible. The subdivider and/or contractor shall at all times have a competent superintendent acting as his agent on the project. The superintendent shall be capable of reading and thoroughly understanding the plans and specifications and he shall receive instructions from the inspector. The superintendent shall have full authority to execute the orders or directions of the inspector and to promptly supply such materials, tools, plant equipment, and labor as may be required. A superintendent shall be furnished irrespective of the amount of work sublet.
(Ord. 1971-2, passed 4-6-71)