1283.12 MAXIMUM LOT COVERAGE.
   The maximum percentage of lot building coverage in an I Industrial District shall be determined by the use and provisions of required off-street parking, loading and unloading and required yard areas.
(Ord. 99-1. Passed 3-22-99; Ord. 2010-05. Passed 3-8-10.)