1268.04 PLANNED UNIT DEVELOPMENTS (PUD); TRACT REQUIREMENTS.
   (a)   The minimum required land area for a planned unit development shall be sixty (60) contiguous acres. The developer shall provide within the planned unit development a sanitary sewage system which shall be of sufficient size and design to collect all sewage from all present and proposed structures in the planned unit, shall connect with the City's system, and shall be otherwise constructed and maintained in conformity with the statutes, ordinances and regulations of the State, the County Health Department, the County Drain Commissioner's office and the City.
   (b)   The developer shall provide within the planned unit development a storm drainage system which shall be of sufficient size and design as will, in the opinion of the City Engineer, collect, carry off and dispose of all predictable surface water run-off within the development and any adjoining tributary area, and shall be so constructed as to conform with the statutes, ordinances and regulations of the State, the County Health Department, the County Drain Commissioner's office and the City.
   (c)   The developer shall provide within the planned unit development a water distribution system which shall be of sufficient size and design to supply water to each of the structures to be erected in the development. Such system shall connect to the City's water supply system.
      (1)   The developer shall provide a fire hydrant within three hundred (300) feet of each structure.
      (2)   Water systems shall conform to the statutes, ordinances and regulations of the State, the County Health Department, the County Drain Commissioner's office and the City.
(Res. 24-95. Passed 2-13-95.)