§ 155.282 APPLICATION FOR ZONING COMPLIANCE PERMIT.
   (A)   Each application to the Zoning Enforcement Officer for a zoning compliance permit shall be accompanied by a site plan showing:
      (1)   The actual dimensions of the lot to be built upon;
      (2)   The size of the building or structure to be erected;
      (3)   The location of the building or structure to be erected or the proposed use of the lot. A surveyed site plan may be required when the proposed location of the building, structure, or use would, if located improperly, be in violation with this chapter;
      (4)   The location of existing buildings or structures on the lot, if any;
      (5)   The number of dwelling units the building is designed to accommodate;
      (6)   The approximate setback lines of building on adjoining lots;
      (7)   The intended use of the property;
      (8)   In the case of a private on-site wastewater treatment system (septic system), a copy of the approved permit from the County Health Department or applicable state agency;
      (9)   In the case of a manufactured home, information validating the age, size, model number, and serial number of the manufactured home. A copy of the current bill of sale, current title, or certified tax listing form from the county in which the home is presently located may be used to validate the age, size, model number, and serial number;
      (10)   In the case of commercial, industrial, or other nonresidential use, any additional information necessary to determine compliance with parking, loading, landscaping, utility, storm drainage, or other applicable sections of this chapter; and
      (11)   Such other information as may be essential for determining whether or not the provisions of this section are being observed.
   (B)   Any zoning permit issued shall expire and be canceled unless the work authorized by it shall have begun within six months of its date of issue, or if the work authorized by it is suspended or abandoned for a period of one year. In the case of site-built construction, the beginning of authorized work shall be deemed to be the pouring of footers for a foundation. In the case of manufactured housing, the beginning of work shall be deemed to be the placement and anchoring of the home and connection of necessary utilities for such manufactured home. In the event a zoning permit expires, written notice shall be given to the person affected, including notice that further work as described in the canceled permit shall not proceed unless and until another zoning permit has been obtained.
(1996 Code, § 155.282) (Ord. passed 5-21-1984; Ord. passed 5-16-2005)