Prior to the issuance of any building permit hereunder, the Building Commissioner shall:
(A) Review all building permit applications to determine full compliance with the provisions of this chapter;
(B) Review all building permit applications for new construction or substantial improvements to determine whether proposed building sites will be reasonably safe from flooding;
(C) Review building permit applications for major repairs within the flood plain area having special flood hazards to determine that the proposed repair:
(1) Uses construction materials and utility equipment that are resistant to flood damage; and
(2) Uses construction methods and practices that will minimize flood damage.
(D) Review building permit applications for new construction or substantial improvements within the flood plain area having special flood hazards to assure that the proposed construction, including prefabricated and mobile homes:
(1) Are protected against flood damage;
(2) Are designed or modified and anchored to prevent flotation, collapse or lateral movement of the structure;
(3) Uses construction materials and utility equipment that are resistant to flood damage; and
(4) Uses construction methods and practices that will minimize flood damage.
(1982 Code, § 7-13)