§ 51.21 REGULATIONS FOR SEWER CONNECTION.
   (A)   The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the town. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the latest edition of the ASTM and SPCF Manual of Practice shall apply.
   (B)   Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by the building drain shall be lifted by an approved means and discharged to the building sewer.
   (C)   No person shall make connection of roof downspouts, exterior foundation drains, areaway drains or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer.
   (D)   The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the town or the procedures set forth in appropriate specifications of the latest edition of the ASTM and the WPCF Manual of Practice. All connections shall be made gas tight and watertight. Any deviation from the prescribed procedures and materials must be approved by the Superintendent before installation.
   (E)   The applicant for the building sewer permit shall notify the Inspector when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the Inspector or his or her representative.
   (F)   All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property
disturbed in the course of the work shall be restored in a manner satisfactory to the town.
   (G)   All services for connection to the sewage works to be performed by the utility shall be done Monday through Friday, inclusive and it is specifically determined that no work shall be performed by the utility on Saturday, Sunday or a legal holiday.
(1982 Code, § 14-10) Penalty, see § 51.99