(A) Plans for upgrading, stripping, excavating, and filling work bearing the stamp of approval of the Administrator shall be maintained at the site during the progress of the work. The permittee shall inspect and maintain on-site records of such inspections using the form provided in Appendix A of Ord. 9098, or an alternate inspection form that has been approved by the Administrator. Any necessary repairs to soil erosion and sediment control measures shall be made and reported in the on-site inspection records. Reports shall be made accessible to the administrator throughout the duration of the project. Inspections shall occur at the intervals specified below.
(1) Upon completion of installation of sediment and runoff control measures (including perimeter controls and diversions), prior to proceeding with any other earth disturbance or grading;
(2) After rough grading;
(3) After final grading; and
(4) At least once every seven calendar days and within 24 hours of the end of a storm or by the end of the following business or work day where the rain accumulation is 0.5 inches or greater. (Only required for Class 1 permits.)
(B) Any permits shall be on display at the site throughout the duration of the project.
(C) An electronic copy of the inspection reports and a copy of the as-built document shall be submitted to the Administrator upon completion of the project. A certificate of occupancy will not be provided until such reports and as-built documents have been submitted.
(Ord. 9098, passed 5-16-17) Penalty, see § 170.99