(A) Project right-of-way lines have been established along the east side of Gilbert Street and the north side of Fairchild Street in the northeast quadrant of the Gilbert Street-Fairchild Street intersection at the sign pylon of the First National Bank of the city as shown on plans designated as state section (47Z-3) I.
(Ord. 6962, passed 1-18-83)
(B) Project right-of-way lines have been established along the east and west sides of Vermilion Street and the north and south sides of Fairchild Street.
(Ord. 7031, passed 12-20-83) (Am. Ord. 7451, passed 4-17-90; Am. Ord. 7492, passed 6-19-90)