§ 100.42 EXCAVATION REPAIR AND REPLACEMENT.
   (A)   All work within the public right-of- way beneath the pavement structure shall be governed by the current Standard Specifications for Water and Sewer Main Construction in Illinois.
   (B)   Selected granular backfill compacted in 6 inch lifts shall be used for final backfill in streets with aggregate surfaces and in improved alleys. Flowable fill control low strength materials shall be used for final backfill in streets and approaches with improved surfaces.
(Ord. 7472, passed 6-19-90; Am. Ord. 8659, passed 7-21-09; Am. Ord. 8941, passed 4-15-14)