19-3.4   Erosion-Control Permit.
   No person shall do any work requiring a grading or paving permit without also obtaining an erosion-control permit.
   The purpose for this requirement is to minimize the quantity of silty debris entering a Town or County-maintained storm water collection facility or roadway due to construction site run-off.
   A site required to implement desilting or erosion-control measures shall have them installed and operable prior to October 15 and at any other time erosion potential exists. The contractor shall install these measures according to the current edition of the Town’s “Erosion-Control and Winterization” guideline and regulations prescribed herein.
   The erosion-control permit may be included within the scope of the grading permit; however, a grading permit may not be issued until an erosion-control plan has been accepted for review by the Town. The erosion-control permit may be waived by the Town Engineer for projects of a minor nature as determined by the Town Engineer. (Ord. #89-22, §92-8.13)