10-11.2 Scope.
   a.   The following devices shall be installed at the following locations in the buildings specified in subsection b.: An approved seismic gas shut-off device (motion sensitive) or an approved excess flow gas shut-off device (non-motion sensitive) shall be installed downstream of the gas utility meter at the beginning of each rigid gas piping system that serves any of the buildings specified in subsection b.
   b.   The devices specified in subsection a. shall be installed in the following buildings and structures:
      1.   In any new building construction (commercial, industrial, or residential) containing fuel gas piping for which a building permit is first issued on or after the effective date of this section.
      2.   In any existing residential building that is altered or added to and the following conditions are met:
         (a)   The building has fuel gas piping supplying the existing building or the addition to the building;
         (b)   A building permit for the work is first issued on or after the effective date of this section; and
         (c)   The value of the alteration or addition is more than ten thousand ($10,000) dollars.
      3.   In any existing commercial or industrial building that is altered or added to and the following conditions are met:
         (a)   The building has fuel gas piping supplying the existing building or the addition to the building;
         (b)   A building permit for the work is first issued on or after the effective date of this section; and
         (c)   The value of the alteration or addition is more than ten thousand ($10,000) dollars.
(Ord. 07-02, § 1)