(A) General disclosure. All industrial dischargers proposing to connect to or to discharge sewage, industrial wastes and other wastes to the treatment works shall comply with all terms of this subchapter within 90 days after the effective date of this subchapter.
(B) Disclosure forms. Industrial dischargers shall complete and file with the village, a disclosure declaration in the form prescribed by the village and accompanied by the appropriate fee. Existing industrial dischargers shall file disclosure forms within 30 days after the effective date of this subchapter, and proposed new industrial dischargers shall file its disclosure forms at least 90 days prior to connecting to the treatment works. The disclosure to be made by the industrial discharger shall be made on written forms provided by the village and shall cover:
(1) Disclosure of name, address and location of the industrial discharger;
(2) Disclosure of Standard Industrial Classification (SIC) number according to the Standard Industrial Classification Manual, Bureau of the Budget, 1972, as amended;
(3) Disclosure of wastewater constituents and characteristics including, but not limited to, those mentioned in this subchapter as determined by bonafide chemical and biological analyses. Sampling and analysis shall be performed in accordance with procedures established by the U.S. EPA and contained in 40 C.F.R. part 136, as amended.
(4) Disclosure of time and duration of discharges;
(5) Disclosure of average daily and instantaneous peak wastewater flow rates, in gallons per day, including daily, monthly and seasonal variations, if any. All flows shall be measured unless other verifiable techniques are approved by the Village Council due to cost of nonfeasibility;
(6) Disclosure of site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections, inspection manholes, sampling chambers and appurtenances by size, location and elevation;
(7) Description of activities, facilities and plant processes on the premises including all materials which are or may be discharged to the sewers or works of the village;
(8) Disclosure of the nature and concentration of any pollutants or materials prohibited by this subchapter in the discharge, together with a statement regarding whether or not compliance is being achieved with the subchapter on a consistent basis and if not, whether additional operation and maintenance activities or additional pretreatment is required for the industrial discharger to comply with this subchapter;
(9) Where additional pretreatment or operation and maintenance activities will be required to comply with this subchapter, the industrial discharger shall provide a declaration of the shortest schedule by which the industrial discharger will provide additional pretreatment or implementation of additional operational and maintenance activities.
(a) The schedule shall contain milestone dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial discharger to comply with the requirements of this subchapter including, but not limited to, dates relating to hiring an engineer, hiring other appropriate personnel, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction and all other acts necessary to achieve compliance with this subchapter.
(b) Under no circumstances shall the village permit a time increment for any single step directed toward compliance which exceeds nine months.
(c) Not later than 14 days following each milestone date in the schedule and the final date for compliance, the industrial discharger shall submit a progress report to the village, including no less than a statement as to whether or not it complied with the increment of progress represented by that milestone date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay and the steps being taken by the industrial discharger to return the construction to the approved schedule. In no event shall more than nine months elapse between such progress reports to the village.
(10) Disclosure of each product produced by type, amount, process or processes and rate of production;
(11) Disclosure of the type and amount of raw materials utilized (average and maximum per day);
(12) All disclosure forms shall be signed by a principal executive officer of the industrial discharger and a licensed professional engineer;
(13) All sewers shall have an inspection and sampling manhole or structure with an opening of no less than 24 inches diameter and an internal diameter of no less than 36 inches containing flow measuring, recording and sampling equipment as required by the village to assure compliance with this subchapter.
(C) Notification. The village will evaluate the complete disclosure form and data furnished by the industrial discharger and may require additional information. Within 30 days after full evaluation and acceptance of the date furnished, the village shall notify the industrial discharger of the village's acceptance thereof.
(Prior Code, § 52.21) (Ord. 5-94, passed 4-11-1994)