§ 152.085 EROSION AND SEDIMENTATION CONTROL.
   (A)   Measures shall be taken to minimize erosion and its impacts during subdivision construction activity. Detailed erosion control plans setting forth the techniques to be used both temporarily (during construction) and permanently (post construction), and a schedule for implementing or installing same shall be submitted with the final plat.
   (B)   Erosion control plans shall be designed to control erosion on site, with the object of eliminating or minimizing erosion or sedimentation impacts off site. Techniques, devices or measures used shall be approved by the village or its designated representative and meet all requirements for storm water NPDES permits. A State Environmental Protection Agency storm water NPDES permit shall be obtained prior to construction.
   (C)   All erosion control devices shall be in place at the start of construction and other measures implemented according to the approved time schedule. Any additional erosion and sediment control measures that are determined to be necessary by the village during construction shall be implemented by the developer. In the case of an emergency, the village reserves the right to enter the subdivision property for the purpose of installing, maintaining and repairing control measures and damaged areas. The village shall be reimbursed by the developer for costs of installing, maintaining and repairing control measures and damaged areas.
(Ord. 5-06, passed 6-12-2006)