4-4-3: PERMIT APPLICATION:
The building permit application must include the following:
   A.   Plot Plan: The plot plan must be accurately drawn to scale and must show at a minimum the following:
      1.   Proposed location and height of the wind power generator.
      2.   Property boundaries of all properties within three hundred feet (300') of the proposed site.
      3.   Locations of all easements within one hundred fifty feet (150') of the proposed site.
      4.   Locations of all homes, buildings, and structures within three hundred feet (300') of the proposed site.
      5.   Major topographical features.
      6.   Location of all power lines, including any overhead service lines going to any home, building, or structure.
   B.   Structural Analysis: Structural analysis of the tower structure written by the manufacturer of the tower, or by a state certified engineer.
   C.   Noise Analysis: Noise analysis showing noise levels at the distance of three hundred feet (300') from the proposed site. (Ord. 157, 8-2-2001)