Skip to code content (skip section selection)
Compare to:
SEC. 19-91.   INSPECTION.
   Before the septic tank system is covered, the permit holder shall notify the director and allow the director to inspect the system. The director shall ascertain that the tanks, connections, and other materials are constructed in accordance with the applicable construction standards. (Ord. Nos. 7821; 15655)