An electrical permit shall be required and obtained from the Building Inspector before any electrical work may be installed or replaced on any building or structure or any premises found within the town limits. Except as specifically provided otherwise, all electrical work shall be done in compliance with such generally recognized electrical code standards as the Building Inspector shall deem appropriate to the specifics of the job or jobs. Permit costs are listed in Chapter 152, Appendix A.
(Ord. 2021-09, passed 9-13-2021)