A. A copy of the surface survey, which indicates the location and number of the well head, and a copy of the plat of each sub-surface directional survey, together with a written report from the engineer who made the survey, fully and correctly interpreting such survey, and accompanied by the affidavit of such engineer, made under oath, that the survey, plat and report thereof were made by him or her, or under his or her direction or personal observation, and that the result as shown thereon and thereby is a full, true and correct representation of such survey, shall be filed with the Director.
B. The survey shall be based on the City's GPS coordinate system and be in AutoCad format (latest version).
C. A digital copy of the survey shall also be submitted.