§ 9.08.380 DIVISION OF PUBLIC WORKS MAY REPAIR DAMAGE; REMOVE MATERIAL OR DEBRIS.
   A.   Where existing street improvements have been excavated or damaged as the result of underground installations or other work for which a permit has been issued under this Subchapter, or when the repairs made by the permittee are found by the Division to be unsatisfactory, the Division may elect to have the City restore said improvements at the permittee's expense, in which event the restoration of said improvements shall be made by the Division and the cost thereof charged to holder of the permit.
   B.   No person shall fail to remove all building material or debris of any kind whatsoever deposited or maintained on any street, parkway or sidewalk under permit, within five (5) days after the completion of the construction, alteration, repair or demolition of any building or any other work, nor fail to leave the street, parkway or sidewalk in as good or better condition, as the same was prior to the depositing of such material or debris therein. Upon failure of the permittee to remove such material, the Division shall proceed to do such work or have the same done, and the cost thereof shall be paid by the permittee.
('65 Code, § 30-37)