§ 97.19 EXCEPTIONS AND EXEMPTIONS.
   (A)   The Common Council, upon receiving a special written request at a regular meeting of the Council may except any overhead or above ground extensions to the utility operating system provided the extension will be placed underground within two years and a performance bond determined by the Council is filed.
('77 Code, § 17.004)
   (B)   If the overhead system to be constructed is to operate in a voltage range or class above 20 KV, then such construction is exempted from this subchapter, provided the construction is performed under the latest recommended designs for such range and voltage.
('77 Code, § 17.005)
(Ord. 166, eff. 11-4-66)