§ 32.02 LIMITATIONS.
   The Treasurer shall be directed that the property to be benefitted shall bear the cost of the improvement within the following maximum limitations.
   (A)   Sidewalks, 100% of the cost of new construction.
   (B)   Sewers, 100% of the cost of new construction.
   (C)   Water lines, 100% of the cost of new construction except where crossing public right-of-way.
   (D)   Paving of roads and streets, 50% of the cost of new paving.
   (E)   All other special assessments for related construction shall be limited as the Treasurer may direct.
('77 Code, § 17.117) (Ord. 187, eff. 8-1-72)