The city may require monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems, to be provided and operated at the user's own expense. The monitoring facility should normally be situated on the user's premises, but the city may, when such a location would be impractical or cause undue hardship to the user, allow the facility to be constructed in the public street or sidewalk area and located so that it will not obstructed by landscaping or parked vehicles. There shall be ample room in or near any sampling manhole or facility to allow accurate sampling and preparation of samples for analysis. The facility, sampling, and measuring equipment shall be maintained at all times in a safe and proper operating condition at the expense of the user. Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with plans and specifications submitted to and approved by the city and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the city.
(Ord. 257, passed 6-3-91) Penalty, see § 51.999