§ 150.24 TRENCHLESS EXCAVATION.
   As a condition of all applicable permits, permittees employing trenchless excavation methods including, but not limited to, horizontal directional drilling, shall follow all requirements set forth in M.S. Ch. 216D, as it may be amended from time to time, and Minn. Rules Ch. 7560 and shall require potholing or open cutting over existing underground utilities before excavating, as determined by the city.
(Ord. 2014-08, passed 11-10-2014)