8-1-4: INSPECTION AND APPROVAL:
All service line installations for which a permit was issued shall be made at such point or in such manner as directed by the public works department and plumbing inspector, and no connection, work or installation shall be backfilled or covered in any manner until the same has been inspected. Approval shall be noted on the posted permit and signed by the inspecting officer. (Ord. 293-M, 11-13-1996)