§ 55.58 EXCAVATIONS.
   (A)   All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city.
   (B)   In making excavations in streets, alleys or sidewalks for the purpose of installing pipe or making repairs, the paving, stones and earth must be removed and deposited in a manner that will occasion the least inconvenience to the public and provide for adequate drainage. No person shall leave an excavation made in the street, alley or sidewalk open at any time without a barricade, and during the night, warning lights. After the house sewer is laid, the public ways and property shall be restored to good condition. If the excavation in the public ways and property is left open or unfinished for a period of 24 hours or more, the Sewer Commissioner shall have the duty to finish or correct the work, and all expenses so incurred shall be charged to the owner, occupant or lessee of the property.
(1976 Code, § 3-209) (Ord. 629, passed 5-8-1980) Penalty, see § 55.99