§ 8. INTEGRAL CURB.
   (A)   When integral vertical curbs are required along the edges of all street pavement, depressed curbs shall be provided at all driveway entrances and at such other locations as designated by the approved plans.
   (B)   The integral curb shall be constructed with or immediately following the finished operation. Special care shall be taken so that the curb construction does not lag the pavement construction and form a cold joint.
   (C)   In placing curb concrete, sufficient spading shall be done to secure adequate bond with paving a slab and eliminate all voids in the curb.
   (D)   Curbs shall be formed to the cross-section in accordance with App. C of this chapter.
(1984 Code, Ch. 157, App. A, § 8) (Ord. O-86-78, passed 8-17-1978)