§ 150.17 PERMIT FEES.
   (A)   The city hereby adopts the Schedule of Fees below for the processing and issuing of zoning permits, building permits and for Board of Adjustment hearing fees.
      (1)   Schedule of fees - residential.
Residential Building Permit Fees
Construction Type
Fee
Due w/app
Bal Due
Notes
Residential Building Permit Fees
Construction Type
Fee
Due w/app
Bal Due
Notes
Accessory uses not listed herein
$148
Total
3, 12, 16, 32
Addition
$0.208/sf
$200
Prior to permit
3, 16, 18, 19, 32
Alteration/remodel
$0.208/sf
$200
Prior to permit
1, 8, 16, 32
Basement finish
$296
Total
3, 16, 25, 32
Condominium
$0.208/sf
$200
Prior to permit
8, 16, 32
Covered deck/porch
$208
Total
3, 16, 23, 31, 32
Deck
$148
Total
3, 16, 27, 32
Demolition
$92
Total
3, 16, 28, 32
Electrical permit
$30
Total
32, 33
Fence>6 ft. in height
$92
Total
3, 16, 32
In-ground pool
$415
Total
3, 10, 16, 32
Large accessory storage structure/detached garage
$445
Total
3, 16, 18, 19, 32
Modular home/manufactured home
$326
Total
3, 16, 24, 32
Move and set/permanent foundation
$326
Total
3, 16, 30, 32
Repair
$148
Total
3, 16, 20, 32
Residential mechanical
See HVAC fee schedule
Retaining wall
$208
Total
3, 15, 16, 32
Single-family dwelling (detached)
$0.208/sf
$200
Prior to permit
8, 16, 22, 32
Small accessory storage structure
$148
Total
3, 16, 17, 32
Small projects
$92
Total
3, 16, 32, 35
Sun room
$326
Total
3, 16, 32
Townhome
$0.208/sf
$200
Prior to permit
8, 16, 21, 32
Two-family dwelling
$0.208/sf
$200
Prior to permit
8, 16, 26, 32
Special Provisions
Fee
Due
Notes
Special Provisions
Fee
Due
Notes
Appeal of staff decision
$356
With application
N/A
Construction without a permit
Fee x 2
Total due w/application
3, 13, 32
Fast track processing
Fee x 1.5
1.5 x amt due w/application
3, 6, 32
Foundation only
$237
With application
2, 3, 32
Permit reissuance
% of permit
With reissuance
34
Plan revision (after 2 submittals)
$130
At time of 3rd submission
3, 5, 32
Re-inspections (after 1 at no cost)
$130
Prior to CO
3, 4, 32
Special inspections
$208
Prior to CO
3, 7, 32
Residential Building Permits
No.
Notes: Definitions/Clarifications/Policies
Residential Building Permits
No.
Notes: Definitions/Clarifications/Policies
1
Alteration/Remodel: renovation of an existing structure or a finished area within a structure.
2
Foundation Only: construction of the footers, slab and foundation prior to issuance of the building permit for the entire structure. (Requires an additional charge.)
3
Flat Fee: a one-time fee for plan review, permitting, inspections and certificate of completion.
4
Reinspection Fee: the letter that accompanies each building permit will state the number of inspections covered by the fee. Applicants will be permitted one free reinspection beyond those covered by the application fee. Additional reinspections require an additional charge.
5
Plan Revision: two reviews of submitted plans (one initial and one re-submittal) are included in each application fee. Additional plan revisions require an additional charge.
6
Fast Track Processing: review of building permit application and plans outside normal channels for time-sensitive projects. (Requires an additional charge.)
7
Special Inspection: requested before or after hours inspections accommodated as staffing allows.
8
Square Footage Fee: a one-time fee for plan review, permitting, inspections and certificate of completion based on the number derived from measuring total floor space at the subfloor level including the enclosing walls. (Includes basement area, first floor area, second floor area, garage, bonus room, covered deck. Excludes porches and uncovered decks and patios.)
9
Addition: an addition to any structure located on a residential lot.
10
In-Ground Pool: a swimming pool located below grade with a minimum water depth of 18 inches.
11
Above-Ground Pool: a swimming pool located above grade with a minimum water depth of 18 inches.
12
Accessory Structures/Uses: structures or uses not otherwise listed such as flag poles, solar panels and the like.
13
Construction without Permit: commencing construction activities covered by the required building permit but without the permit. (Requires an additional charge.)
14
Residential Electric: applicable when the project includes only electrical work such as lighting the outside of an existing structure or upgrading electrical service.
15
Retaining Wall: a separate permit is required for each 200 lineal feet of retaining wall.
16
Calculating fees: a separate fee is required for each “construction type” specified in the fee schedule even if the individual activities are part of the same project on the same site.
17
Small Acc Structure: a structure consisting of between 120 and 400 square feet used for storage.
18
Large Acc Structure: a structure of greater than 400 square feet used for storage.
19
Detached Garage: an accessory structure used primarily for motor vehicle storage.
20
Repair: reconstruction/repair of a structure on a residential lot.
21
Townhome: a dwelling constructed in an attached grouping of 3 separated by a property line.
22
Single-Family Dwelling: a dwelling not connected to any other dwelling.
23
Covered Deck: a deck covered by a roof. (The fee covers both the deck and the roof.)
24
Modular Home: an industrialized building system product not classified as a modular or mobile home, but which is used as a dwelling.
25
Finished Basement: all activities that are part of the process of changing an unfinished basement into finished living space.
26
Two-Family Dwelling: a structure containing no more than two attached dwellings.
27
Deck: a structure typically built out of wood, with an exterior floor surface, without a roof, and attached to a dwelling on at least one side.
28
Demolition: the complete or partial demolition of a structure on a residential lot.
29
Residential Mechanical: $75 for first unit, $50 for second unit of two-family or $25 for each additional unit for multi-family. Price includes 3 inspections.
30
Move and Set: all activities involved with moving a structure from one site to another.
31
Covered Porch: a structure typically built with concrete, with an exterior floor surface, with a roof, and attached to a dwelling on at least one side.
32
Refunds: all fees collected at the time of application are non-refundable. Once a permit is issued, all fees are non-refundable.
33
Residential Electric: permit cards may be purchased in groups in advance.
34
Permit Reissuance: % of actual permit fee based on % of project completed and approved. See grid.
35
Small Projects: projects normally requiring only one inspection. Additional trips are extra.
 
   (2)   Schedule of fees - commercial.
Commercial Building Permit Fees
Construction Type
Fee
Plus
Due w/App
Bal Due
Notes
1K-5K sf
5001-30K sf
>30K sf
Commercial Building Permit Fees
Construction Type
Fee
Plus
Due w/App
Bal Due
Notes
1K-5K sf
5001-30K sf
>30K sf
Accessory structures/uses
$297
$297
5, 18, 19, 21
Alteration/tenant finish
$474
$0.213/s f
$0.119/s f
$0.06/sf
$474
PTP
1, 2, 6, 13, 18, 19
Cellular tower/antenna colocation
$296
$266
5, 18-20
Change of use
$267
$240
5, 18, 19, 22
Deck
$267
$240
5, 18, 19
Demolition
$148
$133
5, 18, 19
Electrical permit
$30
$30
15, 18, 19
Fence > 6 ft. in height
$92
$80
5, 18, 19
Fire alarm
$326
$408
$524
Full
5, 18, 19
Fire supp system
(4 - 200 heads)
$326
$326
5, 18, 19
Fire supp system
(201 - 400 heads)
$408
$408
5, 18, 19
Fire supp system
(>400 heads)
$524
$524
5, 18, 19
Foundation only
$296
$296
3, 16, 19
HVAC
See HVAC fee schedule.
New structure/additions: industrial, warehouse
$1,18 6
$0.119/s f
$0.06/sf
$1,186
PTP
6, 13, 18, 19
New structure: business/mercantile, assembly and other use groups
$1,18 6
$0.178/s f
$0.09/sf
$1,186
PTP
6, 13, 18, 19
Other fire supp system
$326
$326
5, 18, 19
Range hood/suppression
$326
$326
5, 10, 18, 19
Repair
$356
$356
5, 18, 19
Retaining wall
$208
$208
5, 17, 18, 19
Shell
$593
$593
4, 6, 18, 19
Sign
$166
$166
5, 18, 19
State co-permits
50%
Full
18, 19, 23
Swimming pool
$415
$415
5, 18, 19
Temporary tents
$166
$166
5, 16, 18, 19
 
Special Provisions
Fee
Due
Notes
Special Provisions
Fee
Due
Notes
Annual permits
Above fee plus
With application
24
Appeal of staff decision
$356
With application
N/A
Construction without permit
Above fee x 2
Total due with app
14, 19
Fast track processing
Above fee x 1.5
1.5 x amount due w/application
9, 19
Permit reissuance
% of permit fee
With application
25
Plan revisions (after 2 submittals)
$237
At time of 3rd submission
8
Re-inspections (after 1 at no cost)
$155
Prior to CO
7
Special inspections
$237
Prior to CO
12, 19
 
Commercial Building Permits
No.
Notes: Definitions/Clarifications/Policies
Commercial Building Permits
No.
Notes: Definitions/Clarifications/Policies
1
Tenant Finish: new construction within a vacant non-residential space.
2
Alteration: renovation of an existing structure or a finished area within a structure.
3
Foundation Only: construction of the footers, slab and foundation prior to issuance of the building permit for the entire structure. (Requires an additional charge paid at the time of application.)
4
Shell: construction of the new structure that excludes all interior work except stairwells and elevator shafts. Certificates of occupancy are not issued for shells. A shell permit requires a stand-alone application unrelated to the full application that will follow.
5
Flat Fee: a one-time fee for plan review, permitting, inspections and certificate of completion.
6
Square Footage Fee: the total fee due includes the base fee plus the square footage times the multiplier shown.
7
Reinspection Fee: the letter that accompanies each building permit will state the number of inspections covered by the fee. Applicants will be permitted one free reinspection per permit; additional reinspections require an additional charge.
8
Plan Revision: 2 reviews of submitted plans (1 initial and 1 resubmittal) are included in each application fee. Additional plan revisions require an additional charge.
9
Fast Track Processing: review of building permit application and plans outside normal channels for time sensitive projects. (Requires an additional charge.)
10
Range Hood: each hood being installed requires a separate fee.
11
Range Hood Fire Suppression: each fire suppression system being installed requires a separate fee.
12
Special Inspection: requested before or after business hours inspection accommodated as staffing allows.
13
Basis for Square Footage Fees: new construction and additions are calculated from the outside dimensions of the building, plus all floor areas including all unfinished areas. Tenant finish fees are based on the entire square footage of the tenant space. Interior alterations are based on the square footage of the area being renovated.
14
Construction w/o a Permit: commencing construction activities covered by the required building permit but without the permit. (Requires an additional charge.)
15
Commercial Electric: permit cards may be purchased in groups in advance.
16
Sign/Tent: fee covers all sign or tents being installed. If both, then one fee for each type to be erected.
17
Retaining Wall: a separate permit is required for each 200 lineal feet of retaining wall.
18
Calculating fees: a separate fee is required for each “construction type” specified in the fee schedule even in the individual activities are part of the same project on the same site.
19
Refunds: all fees collected at the time of application are non-refundable. Once a permit is issued, all fees are non-refundable.
20
Cellular Antenna Tower: an application and permit are required for new construction as well as for co-locating new antennae on an existing structure and thereby expanding its scope/intensity. Not required for replacement.
21
Accessory Structure/Use: structures or uses not otherwise listed such as flag poles, paint booths, overhead cranes, playground equipment, site place/telescoping, bleachers and the like.
22
Change of Use: changing the use of a structure or a space within it from one Use Group to another, as defined by the State Building Code.
23
State Co-Permits: required by state law, these permit fees cover inspections not performed by state personnel. (Minimum fee is $200; maximum is 50% of normal NKAPC fee.)
24
Annual Permits: construction value plus a per-trip fee based on $45/hour after the first inspection.
25
Permit Reissuance: % of actual permit fee based on % of project completed and approved. See grid.
 
SCHEDULE OF FEES - ZONING ADMINISTRATION
Activity
Fee
SCHEDULE OF FEES - ZONING ADMINISTRATION
Activity
Fee
Board of Adjustments
$350
Change of use
$80
Home occupations
$53
Sign deposit for BOA hearings refundable on return
$35
Zoning permits
   Accessory structures/uses
$80
   Commercial/industrial
$213
   Multi-family
$160
   Signs
$107
   Single-family
$107
   Two-family
$107
 
No.
Notes: Definitions/Clarifications/Policies
No.
Notes: Definitions/Clarifications/Policies
1
Alteration/Remodel: renovation of an existing structure or a finished area within a structure.
2
Foundation Only: construction of the footers, slab and foundation prior to issuance of the building permit for the entire structure. (Requires an additional charge)
3
Flat Fee: a one-time fee for plan review, permitting, inspections and certificate of completion.
4
Re-inspection Fee: the letter that accompanies each building permit will state the number of inspections covered by the fee. Applicants will be permitted 1 free re-inspection beyond those covered by the application fee. Additional re-inspections require an additional charge.
5
Plan Revision: 2 reviews of submitted plans (one initial and one re-submittal) are included in each application fee. Additional plan revisions require an additional charge.
6
Special Inspection: requested before or after hours inspections accommodated as staffing allows.
7
Square Footage Fee: a one-time fee for plan review, permitting, inspections and certificate of completion based on the number derived from measuring total floor space at the subfloor level including the enclosing walls. (Includes basement area, first floor area, second floor area, garage, bonus room, covered deck. Excludes porches and uncovered decks and patios.)
8
Addition: an addition to any structure located on a residential lot.
9
In-Ground Pool: a swimming pool located below grade with a minimum water depth of 18 inches.
10
Above-Ground Pool: a swimming pool located above grade with a minimum water depth of 18 inches.
11
Accessory Structures/Uses: structures or uses not otherwise listed such as flag poles and the like.
12
Construction w/o Permit: commencing construction activities covered by the required building permit but without the permit. (Requires and additional charge.)
13
Retaining Wall: a separate permit is required for each 200 lineal feet of retaining wall.
14
Calculating fees: a separate fee is required for each “construction type” specified in the fee schedule even if the individual activities are part of the same project on the same site.
15
Small Acc Storage Structure: a structure consisting of between 120 and 250 square feet used for storage.
16
Lg Acc Storage Structure: a structure of greater than 250 square feet used for storage.
17
Detached Garage: an accessory structure used primarily for motor vehicle storage.
18
Repair: reconstruction/repair of a structure on a residential lot.
19
Townhome: a dwelling constructed in an attached grouping of three separated by a property line.
20
Single-Family Dwelling: a dwelling not connected to any other dwelling.
21
Covered Deck: a deck covered by a roof. (The fee covers both the deck and the roof.)
22
Modular Home: an industrialized building system product not classified as a modular or mobile home but which is used as a dwelling.
23
Finished Basement: all activities that are part of the process of changing an unfinished basement into finished living space.
24
Two-Family Dwelling: a structure containing no more than two attached dwellings.
25
Deck: a structure typically built out of wood, with an exterior floor surface, without a roof, and attached to a dwelling on at least one side.
26
Demolition: the complete or partial demolition of a structure on a residential lot.
27
Residential Mechanical: applicable when the project includes a mechanical work such as repair, replacement or installation of furnaces, boilers, water heaters, condenser units and the like per dwelling unit.
28
Move and Set: all activities involved with moving a structure from one site to another.
29
Covered Porch: a structure typically built with concrete, with an exterior floor surface, with a roof, and attached to a dwelling on at least one side.
30
Refunds: all fees collected at the time of application are non-refundable. Once a permit is issued, all fees are non-refundable.
 
   (B)   In order for the schedule of fees above to continue to reflect the increasing inflationary costs of administration of the above programs, the fees shall, on an annual basis, be adjusted by the City Manager and City Finance Director to reflect any increase that would be necessary with the conventional application of the Consumer Price Index as promulgated by the state’s Office for Local Government to these fees. Based on this calculation, the fees shall be increased annually and the schedule of fees shall be so amended by operation of this provision.
   (C)   (1)   HVAC installation permit fees - one- and two-family dwellings. The fee for each heating, ventilation or air conditioning system installation permit for one- and two-family dwellings shall be $75 for the first system, plus $50 for each additional system.
      (2)   HVAC installation permit fees - multi-family dwellings. The fee for each heating, ventilation or air conditioning system installation permit for multi-family dwellings other than duplexes, shall be $75 for the first system, plus $25 for each additional system.
      (3)   HVAC Installation permit fees - commercial.
         (a)   The fee for each heating, ventilation or air conditioning system installation permit other than one- or two- and multi-family dwellings shall be based upon the total dollar value of each HVAC installation, either actual or estimated.
         (b)   1.   It shall be the obligation of the installing contractor to supply the complete value, including labor and material costs regardless of the purchaser.
            2.   Except as provided in this division (C)(3), an exact figure does not need to be quoted or divulged to the HVAC inspector or department.
            3.   The permit application shall include an affirmative, signed statement that the true value lies within certain limits, as listed in the left column of the table in division (C)(3)(b)3.b. below.
               a.   The fees for heating, ventilation or air conditioning system installation are listed in the right column of the table; and
               b.   The department may request documented proof of costs from the permit applicant if the true value is in question.
HVAC Permit Fees
(set by the state’s Department of Housing, Buildings and Construction)
Residential
Fee*
HVAC Permit Fees
(set by the state’s Department of Housing, Buildings and Construction)
Residential
Fee*
1- and 2-family dwellings (first system)
$75
1- and 2-family dwellings (each additional system)
$50
Multi-family buildings (first system)
$75
Multi-family buildings (each additional system)
$25
Commercial
(amount based on total dollar value of the HVAC installation)
Fee*
$2,000 or less
$75
$2,001 to $10,000
$150
$10,001 to $25,000
$225
$25,001 to $50,000
$275
$50,001 to $75,000
$325
$75,001 to $100,000
$435
$100,001 to $150,000
$550
$150,001 to $200,000
$660
$200,001 to $250,000
$770
$250,001 to $300,000
$890
$300,001 to $400,000
$1,000
$400,001 to $500,000
$1,350
$500,001 to $600,000
$1,500
$600,001 to $700,000
$1,650
$700,001 to $800,000
$1,850
$800,001 to $900,000
$2,050
$900,001 to $1,000,000
$2,250
$1,000,001 to $1,100,000
$2,450
$1,100,001 to $1,200,000
$2,650
$1,200,001 to $1,300,000
$2,850
$1,300,001 to $1,400,000
$3,050
$1,400,001 to $1,500,000
$3,250
$1,500,001 and above
$3,450
 
(1984 Code, § 150.12) (Ord. O-22-10, passed 6-28-2010; Ord. O-01-11, passed 2-8-2011; Ord. O-05-11, passed 4-5-2011; Ord. O-36-12, passed 10-23-2012)