§ 150.40 WET EXCAVATIONS.
   Whenever the backfill in an excavation shall obtain a moisture content too high for proper compaction, whether due to groundwater, rain or surface water, the contractor shall remove the wet material and import dry material. The backfill shall then be compacted as hereinbefore specified.
(Ord. 1019, passed 9-14-1964)