11-18-10: SITE REQUIREMENTS AND SETBACKS:
   A.   Any site upon which a wireless telecommunications tower or antenna is proposed shall meet the following development standards:
      1.   Site setbacks shall be equal to one hundred percent (100%) of the proposed height of the tower or antenna as measured from the base of the tower or antenna. Exception to the setback requirement shall be allowed if engineering documentation is provided that the tower or antenna is designed to collapse within itself, in such case the minimum setback shall be fifty percent (50%) of the tower or antenna height.
The size and dimensions of the minimum lot size shall be determined by the distance of the setback from the property boundary or any public street. (Ord. 527, 8-4-1997)