§ 152.04 NEW SUBDIVISIONS AND DEVELOPMENTS.
   The Building Official and City Engineer shall review all subdivision proposals and other proposed new developments to ensure that all such proposals are consistent with the need to minimize flood damage and that all public utilities and facilities such as sewer, gas, electrical, and water systems are located, elevated, and constructed to minimize or eliminate flood damage and adequate drainage is provided so as to reduce exposure to flood hazards.
(Prior Code, § 18-1-4)