§ 51.069 MONITORING FACILITIES.
   (A)   The City shall require to be provided and operated, at the categorical industrial user and significant industrial user’s own expense, monitoring facilities to allow inspection, sampling, and flow measurement of the building sewer and/or internal drainage systems. The monitoring facility should normally be situated on the categorical user and significant industrial user’s premises, but the City may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located so that it will not be obstructed by landscaping or parked vehicles.
   (B)   As a condition of the permit, all discharged industrial wastewater shall pass through a designated sampling location. There shall be ample room in or near such sampling manhole or facility to allow accurate flow proportional sampling and preparation of samples for analysis. The facility flow metering equipment shall be maintained at all times, in a safe and proper operating condition at the expense of the user.
   (C)   Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with the City’s requirements and all applicable local construction standards and specifications. Construction shall be completed within 90 days following written notification by the City.
(Prior Code, § 12-8-4) (Ord. 13-05, passed 3-25-2013)