4-2-12: REQUIREMENTS FOR REMOVAL:
Any wind powered generator that is abandoned, damaged, inoperable, or unused for power generation shall be removed within six (6) months of the cessation of operations, unless an extension is approved by the board of adjustment. If such an extension is not approved, such wind powered generator shall be deemed a nuisance and require its removal, at the property owner's expense. After the wind powered generator's removal, the owner of the site shall restore the site to its original or an improved condition. (Ord. 400, 7-20-2009; amd. 2015 Code)