4-1-4: INSPECTIONS:
Inspections shall be conducted by the building inspector. Where other departments require inspection, the building inspector shall ensure they are conducted within the time frame allowed. Final inspections and issuance of certificates of occupancy shall be conducted in accordance with the international building code.
Where applicable the work listed below must be inspected prior to covering. Request for an inspection must be made seventy two (72) hours in advance.
   A.   Footing.
   B.   Foundation wall.
   C.   Concrete slab.
   D.   Under floor (crawl space).
   E.   Frame (walls, trusses, rafters, floor, etc.).
   F.   Energy efficiency (insulation, glazing, etc.).
   G.   Wall board.
   H.   Final - issue certificate of occupancy.
   I.   Reroof/re-side - tear off, in progress and final.
Written inspection reports or verbal communication will be conveyed to the contractor, job superintendent, design professional or owner with a copy or notation retained in the inspector's file should any discrepancies be observed.
Depending on the scope of work, not all of the above inspections may be necessary. Circumstances may require additional site visits for consultation or discrepancy resolution. (Ord. 409, 2-17-2015)