(A) A permit shall be required under authority of the Solid Waste Management Act, being 35 P.S. §§ 6018.101 through 6018.1003 for all activities involving the removal or replacement of shingles or other roofing material.
(B) Fees for a roof material disposal permit shall be set, from time to time, by resolution of the Township Supervisors adopted at duly advertised public meetings.
(C) The roofing material disposal permit shall initially require a fee of $50, which shall be refunded upon submission of proof of disposal. If roofing material is not disposed of, this fee shall be retained and used to defray the cost of sending a permit officer to the site to verify that no roofing material was removed.
(D) No building permit or building permit fee shall be required, in addition to the disposal permit and fees described above, for roof material replacements on single-family residential dwellings. Building permits shall be required for any roof modifications other than where only roofing material is replaced
(E) ROOFING MATERIAL as used in this section is the surface or subsurface of any roof.
(Res. R13-09, passed 10-21-2009) Penalty, see § 150.99