All sewers, sewer laterals and sewer connections shall be laid on all improved streets before paving where connection with the township sewers is practicable, and shall be required by the Township Supervisors, and all gas and water mains and all service connections shall be laid before the paving of the streets where water and gas is available, and all other mains, pipes and conduits and the like shall be installed before paving of the cartway where it is proposed to install any such service mains in the streets.
(Res. 192, passed 11-6-1959)