SECTION 14-647.   ADDITIONAL INSPECTIONS.
The issuance of three (3) or more pumping permits (see Section 14-646) within a twelve (12) month period for the same Subsurface Sewage Treatment System shall be considered strong evidence by the City that the system is approaching failure or is inadequately designed. Upon the issuance of a third pumping permit within a twelve (12) month period, the Building Official shall review the inspection and pumping reports and then, at his discretion, inspect the entire Subsurface Sewage Treatment System to determine that it is in compliance with the minimum standards of Section 14-645. A failed Subsurface Sewage Treatment System shall be cleaned, repaired, maintained, reconstructed, or relocated, as determined by the Building Official.
[§ 14-646, added by Ord. No. 89-14, effective July 13, 1990, changed to 14-647 and amended by Ord. No. 98-5, effective July 30, 1998, amended by Ord. No. 07-02, effective March 1, 2007.]