12.24.070 Excavation specifications.
   A.   All work and repair described herein shall be done in accordance with standards and specifications prescribed by the city engineer. Before the pavement is replaced said permittee shall call upon the city engineer to inspect the work already done before proceeding further.
   B.   After said inspection has been made, said permit-tee shall complete the work so that the place where excavated will conform to the road, street, sidewalk or alley where such excavation was made as originally improved. All of said work shall be done to the acceptance and satisfaction of the city engineer.
   C.   In cases where any tile drain is cut, crushed or in any other way disturbed so as to render the same in unsatisfactory working order, the permittee shall cause such structure to be repaired or rerouted according to the standards and specifications of the city engineer. Permittee shall immediately notify the city engineer of any underground structures, drains, pipes, conduits or wires struck during the work.
   D.   On any street which is classified as a primary arterial, secondary arterial, or one-way arterial and on any street which has been paved or repaved within the last five years, the permittee shall be required to use a method of installation which will not require the disruption of the pavement unless the permittee can demonstrate to the city engineer that such a method is impossible or infeasible.
   E.   On any street which is classified as a primary arterial, secondary arterial, one-way arterial, or collector, no work shall be done from 7:00 to 8:30 A.M., from 3:30 to 5:30 P.M., or at any time on a Friday except in the case of an emergency or if specifically allowed by the city engineer. (Ord. 08-28, § 4, 2008; Ord. 96-55 § 7, 1996)