§ 53.33 MAIN LINES INSTALLATION.
   (A)   The Board shall determine the location, type and capacity of all main lines. Easements may be required where deemed necessary by the Board to ensure the safety or efficiency of the operation or maintenance of the gas supply system.
   (B)   The cost of main lines shall be the responsibility of the owner or developer requesting connection to the gas distribution system. All gas main lines shall be a minimum of 2 feet in depth.
(Ord. 2009-02, passed 4-13-2009)