(A) The customer (developer or property owner) shall pay the costs for utility extensions based on the current extension policy adopted by the Water Department. A customer shall be responsible for construction costs associated with connecting to the water system.
(B) A development impact fee if adopted by the town will be required as a condition for any new water service connection or meter size upgrade.
(C) The Water Department shall prescribe the water meter size based on fixture units served or planned to be served.
(1986 Code, § 16-8) (Am. Ord. 2015-02, passed 3-16-2015)