§ 156.27 WATER SYSTEM.
   (A)   Water mains connecting with existing municipal or private utility distribution systems shall be installed to serve each lot. Each lot whether subdivided or not shall have a separate water service meeting the requirements of the utility department.
   (B)   Prior to final approval, the developer shall submit a letter from the governing body of the water system certifying the ability of the system to serve the proposed development and evidence that a satisfactory agreement has been made for connections to the system.
   (C)   The design of adequate water supply shall consider additional water improvements needed for new source, treatment, storage, transmission and distribution (including fire hydrants).
   (D)   The developer shall provide improvement plans and profiles prepared by a registered engineer for the system describing the water line system design, line sizes and types and associated hardware and their locations, including valves, thrust blocks, fire-hydrants, back-flow prevention valves, sewage line cross-overs, meter locations, stubs and all other elements of the system design and equipment.
(Ord. 2017-02, passed 11-13-2017)